Creating Future Infrastructure

Whitebirk Depot

The existing building was demolished and a new technology hub was erected in its place. The design specified a steel portal frame with a insulated panel cladding system. The out come was a low cost effective building.

Previous
Previous

Hartington Road Refurbishment

Next
Next

Whitebirk Office